Bureau of Reclamation Lake Tulloch Operating levels


The Spring/Summer 2014 operating schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.    The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
From
Through
Low
High











3/1/14
3/19/14
498.6
501.6










3/20/14
3/26/14
498.6
501.6










3/27/14
4/2/14
499.4
502.4










4/3/14
4/9/14
500.2
503.2










4/10/14
4/16/14
501.1
504.1










4/17/14
4/23/14
501.9
504.9










4/24/14
4/30/14
502.7
505.7










5/1/14
5/7/14
503.5
506.5










5/8/14
5/14/14
504.3
507.3










5/15/14
5/21/14
505.1
508.1










5/22/14
5/28/14
506.0
509.0










5/29/14
9/15/14
506.5
509.5