Tulloch Reservoir Schedule as received from the US Bureau of Reclamation


The Fall/Winter 2014-2015 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.  The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2014
9/15/2014
506.5
509.5
9/16/2014
9/22/2014
505.2
508.2
9/23/2014
9/29/2014
504.1
507.1
9/30/2014
10/6/2014
503.0
506.0
10/7/2014
10/13/2014
501.9
504.9
10/14/2014
10/20/2014
500.8
503.8
10/21/2014
10/27/2014
499.7
502.7
10/28/2014
3/20/2015
498.6
501.6
 

Wednesday, October 8, 2014

Tulloch Reservoir Schedule as received from the US Bureau of Reclamation


The Fall/Winter 2014-2015 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.  The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2014
9/15/2014
506.5
509.5
9/16/2014
9/22/2014
505.2
508.2
9/23/2014
9/29/2014
504.1
507.1
9/30/2014
10/6/2014
503.0
506.0
10/7/2014
10/13/2014
501.9
504.9
10/14/2014
10/20/2014
500.8
503.8
10/21/2014
10/27/2014
499.7
502.7
10/28/2014
3/20/2015
498.6
501.6
 

Tuesday, September 23, 2014

Tulloch Reservoir Schedule as received from the US Bureau of Reclamation


The Fall/Winter 2014-2015 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.  The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2014
9/15/2014
506.5
509.5
9/16/2014
9/22/2014
505.2
508.2
9/23/2014
9/29/2014
504.1
507.1
9/30/2014
10/6/2014
503.0
506.0
10/7/2014
10/13/2014
501.9
504.9
10/14/2014
10/20/2014
500.8
503.8
10/21/2014
10/27/2014
499.7
502.7
10/28/2014
3/20/2015
498.6
501.6

Tuesday, September 2, 2014

Tulloch Reservoir Schedule as received from the US Bureau of Reclamation


The Fall/Winter 2014-2015 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.  The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2014
9/15/2014
506.5
509.5
9/16/2014
9/22/2014
505.2
508.2
9/23/2014
9/29/2014
504.1
507.1
9/30/2014
10/6/2014
503.0
506.0
10/7/2014
10/13/2014
501.9
504.9
10/14/2014
10/20/2014
500.8
503.8
10/21/2014
10/27/2014
499.7
502.7
10/28/2014
3/20/2015
498.6
501.6

Wednesday, September 25, 2013

Lake Tulloch Draw Down 2013/14

Tulloch 2013-2014 schedule, as received from the Bureau of Reclamation.  Please keep in mind that the schedule is subject to change by the Bureau in the event of storm or rain event, or other unforeseen event.  Homeowners and other users of the reservoir are advised to secure all facilities as necessary, and to exercise care when operating within the reservoir.  
The Fall/Winter 2013-2014 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.    The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2013
9/15/2013
506.5
509.5
9/16/2013
9/22/2013
505.2
508.2
9/23/2013
9/29/2013
504.1
507.1
9/30/2013
10/6/2013
503.0
506.0
10/7/2013
10/13/2013
501.9
504.9
10/14/2013
10/20/2013
500.8
503.8
10/21/2013
10/27/2013
499.7
502.7
10/28/2013
3/20/2014
498.6
501.6

Thursday, August 29, 2013

Lake Tulloch draw down 2013/2014

Tulloch 2013-2014 schedule, as received from the Bureau of Reclamation.  Please keep in mind that the schedule is subject to change by the Bureau in the event of storm or rain event, or other unforeseen event.  Homeowners and other users of the reservoir are advised to secure all facilities as necessary, and to exercise care when operating within the reservoir.  
The Fall/Winter 2013-2014 drawdown schedule for Tulloch Reservoir is shown below.   This schedule complies with U.S. Army Corps of Engineers flood control requirements.    The reservoir will generally be managed to the target elevation ranges, but some variation may occur due to large natural inflows or facility and operational constraints.
Dates
Elevation Range
From
Through
From
To
6/1/2013
9/15/2013
506.5
509.5
9/16/2013
9/22/2013
505.2
508.2
9/23/2013
9/29/2013
504.1
507.1
9/30/2013
10/6/2013
503.0
506.0
10/7/2013
10/13/2013
501.9
504.9
10/14/2013
10/20/2013
500.8
503.8
10/21/2013
10/27/2013
499.7
502.7
10/28/2013
3/20/2014
498.6
501.6

Thursday, December 20, 2012

And the levels continue to drop

12-20-12
The Lake Tulloch levels should almost be to its final low zone within the next two weeks.

Saturday, September 29, 2012

Tri Dam press release re:Lake Tulloch Draw Down

The Tri Dam Project, a joint venture of the Oakdale Irrigation District and South San Joaquin Irrigation District, is the owner and operator of the Tulloch Dam and Reservoir. The Tri-Dam Project is required to perform scheduled maintenance and safety inspections of the spillway gates at Tulloch Reservoir. This work is required by the Federal Energy Regulatory Commission. To perform this work the reservoir must be drawn down to a lower elevation than typically experienced during the winter months. Listed below is the planned elevation schedule for the fall/winter period of 2012/13. This schedule was issued by the US Bureau of Reclamation and is being forwarded to provide early
notification to the general public for the planned reservoir operating levels. This early notification is intended to inform property owners adjacent to the reservoir and other interested parties to make necessary plans for docks and other facilities that may be affected by this drawdown period. All property owners and other users of the reservoir are encouraged to protect facilities in and around the reservoir to ensure safety and protection of property. This drawdown schedule may be found on Tri Dam’s website at www.tridamproject.com under the tab entitled Tulloch. Interested parties are encouraged to check the website on a regular basis for any potential changes to the schedule.

For full press release with dates and levels CLICK HERE